== Ice in My Dewar (Liquid helium transport Dewar) ==
+
{{he-warning}}
This is of special interest to sites which are far from their liquid helium supplier, and who perform their own liquid helium fills.
This is of special interest to sites which are far from their liquid helium supplier, and who perform their own liquid helium fills.
-
<B><H3>Warning.
+
This document describes what can be done if your liquid He transport dewar exhaust line is ice-clogged.
-
Cryogenic Liquids and Associated Vapor are Dangerous.
+
==The Situation==
-
Wear Protective Clothing and Eye Protection</H3></B>
+
-
 
+
-
 
+
-
The Situation:
+
The Rhodes University in Grahamstown, South Africa, is 120 km from the nearest (Port Elizabeth) Cryogen vendor’s depot. This depot does not always have a cryogenics expert available. We are 1000 km from the supply point, Johannesburg. Another Support point is Cape Town, 800 km distant.
The Rhodes University in Grahamstown, South Africa, is 120 km from the nearest (Port Elizabeth) Cryogen vendor’s depot. This depot does not always have a cryogenics expert available. We are 1000 km from the supply point, Johannesburg. Another Support point is Cape Town, 800 km distant.
Liquid helium (and liquid nitrogen) is delivered by road transport and the transfer of cryogens to the superconducting magnets is performed by university staff members.
Liquid helium (and liquid nitrogen) is delivered by road transport and the transfer of cryogens to the superconducting magnets is performed by university staff members.
-
The Problem:
+
==The Problem==
-
A 100 litre liquid helium delivery Dewar was found to only pressurize with difficulty and it was not possible to vent via the vent-valve (See Figure 1 for terminology). In additional cause for concern and alarm was the discovery that the lower safety valve did not release any gas; neither did the travel valve port . Nevertheless the upper safety valve was able to vent gas, and this was the clue to the puzzle. It was possible probe the helium tank and measure, by sounding tube, that there were close to 100 Litres of liquid helium in the Dewar.
+
A 100 litre liquid helium delivery Dewar was found to only pressurize with difficulty and it was not possible to vent via the vent-valve (See sketch below for terminology). In additional cause for concern and alarm was the discovery that the lower safety valve did not release any gas; neither did the travel valve port . Nevertheless the upper safety valve was able to vent gas, and this was the clue to the puzzle. It was possible probe the helium tank and measure, by sounding tube, that there were close to 100 Litres of liquid helium in the Dewar.
-
The suggested course of action suggested blowing warm (room temperature or warmer) helium gas into the Dewar. He also suggested removing the delivery port / guide pipe assembly.
+
-
The Structural Details of the Dewar:
+
The suggested course of action required blowing warm (room temperature or warmer) helium gas into the Dewar. He also suggested removing the delivery port / guide pipe assembly.
-
After making some measurements, and with some hind-sight after having dismantled part of the Dewar, the structure of the Dewar is believed to be similar to that shown in Figure 1. This is totally the author’s idea of what goes on inside, and if any reader would like to correct this sketch he will be delighted.
+
==The Structural Details of the Dewar==
-
<P align="center">[[Image:Liquid_Helium_Transport_Dewar_Internals.jpg]]</P>
+
After making some measurements, and with some hind-sight after having dismantled part of the Dewar, the structure of the Dewar is believed to be similar to that shown in the figure below. This is totally the author’s idea of what goes on inside, and if any reader would like to correct this sketch the author will be delighted.
-
The sketch shows the Dewar to have two regions, one insulated and containing the cryogenic liquid and the other un-insulated and containing much of the valving. Access to the liquid is via either of two paths.
+
[[Image:Liquid_Helium_Transport_Dewar_Internals.jpg|thumb|Dewar internals]]
-
<P align="center">[[Image:Paths_1_and_2.jpg]]</P>
+
The sketch above shows the Dewar to have two regions, one insulated and containing the cryogenic liquid and the other un-insulated and containing much of the valving. Access to the liquid is via either of two paths. See the sketch below.
 +
 
 +
[[Image:Paths_1_and_2.jpg|thumb|Internal pathways]]
Path 1 passes through the delivery port and the guide pipe, while path 2, passes through any of the pressurization port, vent port, the lower safety port or the travel valve port, passing outside the guide pipe to access the helium tank. Under normal circumstances these two paths are freely connected.
Path 1 passes through the delivery port and the guide pipe, while path 2, passes through any of the pressurization port, vent port, the lower safety port or the travel valve port, passing outside the guide pipe to access the helium tank. Under normal circumstances these two paths are freely connected.
To expel liquid Helium one applies ‘over pressure’ to the liquid surface by connecting pressurized helium gas to the pressurization port. In response to the over pressure liquid is forced up the delivery pipe.
To expel liquid Helium one applies ‘over pressure’ to the liquid surface by connecting pressurized helium gas to the pressurization port. In response to the over pressure liquid is forced up the delivery pipe.
-
Under no-delivery (storage or transportation) conditions the delivery port and pressurization port valves are closed. Normal evaporation of the liquid raises the internal pressure and helium gas is vented via the travel valve, If the Dewar is in delivery mode (travel valve removed and port used for pressurization), but with the delivery port valve closed, excess pressure is released via the lower safety valve.
 
-
Should path 2 be blocked, internal pressure can still be released via the upper safety valve.
+
===Dewar Configurations===
-
The image below shows what appeared to be the situation with the Dewar. Ice had blocked the path from the pressurization port to the liquid surface. Similarly any pressure build-up over the liquid could not be released by the vent valve.
+
With so many valves there are a number of possible configurations. From a functional view-point there are 3.
-
<P align="center">[[Image:Liquid_Helium_Transport_Dewar_Internals_With_ICE.jpg]]</P>
+
*'''Travel or Storage Mode'''
 +
The delivery port is closed and the pressurization port has the travel (safety) valve installed. Normal evaporation of the liquid raises the internal pressure and helium gas is vented via the travel valve.
-
The Repair Procedure:
+
*'''Passive Delivery Mode'''
 +
The travel valve is removed and the port is used for pressurization by fitting a hose-connector (barb). Zero gas pressure is applied. The delivery port valve is closed and, necessarily, the delivery (or transfer) pipe is not installed. Excess pressure is released via the lower safety valve. Should path 2 be blocked, internal pressure can still be released via the upper safety valve.
-
Warning: Open the delivery valve before attempting to remove the delivery port / guide pipe assembly. This should avoid any sudden release of pressure, cold gas and / or liquid when the neck seal is opened.
+
*'''Active Delivery Mode'''
 +
The delivery port valve is open. The delivery pipe is inserted into the transport Dewar. The delivery port seal is tightened. The pressurization / travel valve port valve is open and external gas pressure is applied. Liquid is forced along the delivery pipe and may now be transferred.
-
On the instructions of the vendor the neck-clamp was removed and an attempt was made to withdraw the guide pipe. It was completely stuck. Room-temperature helium gas was applied to the pressurization port at increasing pressure until the upper safety valve opened. Pressure was then rapidly reduced via the delivery port. In this way it was hoped to cause turbulence and allow some warmer helium to reach the blockage. After some minutes of this treatment there were signs of some pressurization of the helium tank but the guide pipe assembly remained stuck.
+
[[Image:Liquid_Helium_Transport_Dewar_Internals_With_ICE.jpg|thumb|The Approximate Position of the ice.]]
 +
===The Repair Procedure===
-
The system was allowed to rest for 2 hours and then a further attempt to move the guide pipe assembly was made. This time it slowly moved. After some minutes of struggle the assembly was removed. A cylindrical collar of Ice surrounded about 3 cm of the guide pipe, some 10 cm from its free end. Apparently the ice had sealed the access to the helium tank via path 2 as shown in Figure 2. The Ice fizzed and sublimed rapidly once in the open air. The guide-pipe/delivery port assembly was then replaced without difficulty. Thereafter the Dewar functioned normally.
+
{{Maintenance-precautions}}
-
Photographic Record:
+
On the instructions of the vendor the neck-clamp was removed and an attempt was made to withdraw the guide pipe. It was completely stuck. Room-temperature helium gas was applied to the pressurization port at increasing pressure until the upper safety valve opened. Pressure was then rapidly reduced via the delivery port. In this way it was hoped to cause turbulence and allow some warmer helium to reach the blockage. After some minutes of this treatment there were signs of some pressurization of the helium tank but the guide pipe assembly remained stuck.
-
<P align="center">[[Image:Whole_Dewar.JPG]]</P>
+
The system was allowed to rest for 2 hours and then a further attempt to move the guide pipe assembly was made. This time it slowly moved. After some minutes of struggle the assembly was removed. A cylindrical collar of Ice surrounded about 3 cm of the guide pipe, some 10 cm from its free end. Apparently the ice had sealed the access to the helium tank via path 2 as shown in Figure 2. The Ice fizzed and sublimed rapidly once in the open air. The guide-pipe/delivery port assembly was then replaced without difficulty. Thereafter the Dewar functioned normally.
-
<P align="center">[[Image:Neck_assy.JPG]]</P>
+
-
<P align="center">[[Image:Loosening_Clamp.JPG]]</P>
+
-
<P align="center">[[Image:Clamp.JPG]]</P>
+
-
<P align="center">[[Image:Withdraw.JPG]]</P>
+
-
<P align="center">[[Image:Guide-pipe.JPG]]</P>
+
-
<P align="center">[[Image:Throat.JPG]]</P>
+
-
<P align="center">[[Image:Plug.JPG]]</P>
+
-
<P align="center">[[Image:o-ring.JPG]]</P>
+
-
<P align="center">[[Image:0-ring_seated.JPG]]</P>
+
-
<P align="center">[[Image:Tank_Position.JPG]]</P>
+
 +
==Photographic Record==
 +
Below is the photographic record of the entire procedure. Click to see full size pictures.
 +
<gallery>
 +
Image:Whole_Dewar.JPG|View of Dewar. The vendor name instances are obscured. This is a Dewar issue and not vendor-specific.
 +
Image:Neck_assy.JPG|Neck Assembly.
 +
Image:Loosening_Clamp.JPG|Loosening the Neck Clamp.
 +
Image:Clamp.JPG|The Neck Clamp.
 +
Image:Withdraw.JPG|Withdrawing the Guide-pipe.
 +
Image:Guide-pipe.JPG|The Delivery valve/Port and Guide Pipe. Marker Shows the Position of the Ice.
 +
Image:Throat.JPG|The Dewar-throat.
 +
Image:Plug.JPG|Plugging the Throat with Paper Towel to Avoid the Ingress of Air.
 +
Image:o-ring.JPG|The 'o'-ring/Gasket Which Seals the Neck Joint.
 +
Image:0-ring_seated.JPG|The 'o'-ring/Gasket seated on the Dewar Side of the Neck Joint.
 +
Image:Tank_Position.JPG|Estimating the Position of the Top of the Helium Tank.
 +
</gallery>
[[Category:Cryogenics]]
[[Category:Cryogenics]]
 +
[[Category:User guides]]

Current revision

Warning. Cryogenic Liquids and Associated Vapor are Dangerous. Wear Protective Clothing and Eye Protection.

Warning. Helium presents a great suffocation hazard. Ensure adequate ventilation when using or repairing Dewars. Never work with liquid He alone.

This is of special interest to sites which are far from their liquid helium supplier, and who perform their own liquid helium fills.

This document describes what can be done if your liquid He transport dewar exhaust line is ice-clogged.

Contents

The Situation

The Rhodes University in Grahamstown, South Africa, is 120 km from the nearest (Port Elizabeth) Cryogen vendor’s depot. This depot does not always have a cryogenics expert available. We are 1000 km from the supply point, Johannesburg. Another Support point is Cape Town, 800 km distant. Liquid helium (and liquid nitrogen) is delivered by road transport and the transfer of cryogens to the superconducting magnets is performed by university staff members.

The Problem

A 100 litre liquid helium delivery Dewar was found to only pressurize with difficulty and it was not possible to vent via the vent-valve (See sketch below for terminology). In additional cause for concern and alarm was the discovery that the lower safety valve did not release any gas; neither did the travel valve port . Nevertheless the upper safety valve was able to vent gas, and this was the clue to the puzzle. It was possible probe the helium tank and measure, by sounding tube, that there were close to 100 Litres of liquid helium in the Dewar.

The suggested course of action required blowing warm (room temperature or warmer) helium gas into the Dewar. He also suggested removing the delivery port / guide pipe assembly.

The Structural Details of the Dewar

After making some measurements, and with some hind-sight after having dismantled part of the Dewar, the structure of the Dewar is believed to be similar to that shown in the figure below. This is totally the author’s idea of what goes on inside, and if any reader would like to correct this sketch the author will be delighted.

Dewar internals
Dewar internals

The sketch above shows the Dewar to have two regions, one insulated and containing the cryogenic liquid and the other un-insulated and containing much of the valving. Access to the liquid is via either of two paths. See the sketch below.

Internal pathways
Internal pathways

Path 1 passes through the delivery port and the guide pipe, while path 2, passes through any of the pressurization port, vent port, the lower safety port or the travel valve port, passing outside the guide pipe to access the helium tank. Under normal circumstances these two paths are freely connected.

To expel liquid Helium one applies ‘over pressure’ to the liquid surface by connecting pressurized helium gas to the pressurization port. In response to the over pressure liquid is forced up the delivery pipe.

Dewar Configurations

With so many valves there are a number of possible configurations. From a functional view-point there are 3.

  • Travel or Storage Mode

The delivery port is closed and the pressurization port has the travel (safety) valve installed. Normal evaporation of the liquid raises the internal pressure and helium gas is vented via the travel valve.

  • Passive Delivery Mode

The travel valve is removed and the port is used for pressurization by fitting a hose-connector (barb). Zero gas pressure is applied. The delivery port valve is closed and, necessarily, the delivery (or transfer) pipe is not installed. Excess pressure is released via the lower safety valve. Should path 2 be blocked, internal pressure can still be released via the upper safety valve.

  • Active Delivery Mode

The delivery port valve is open. The delivery pipe is inserted into the transport Dewar. The delivery port seal is tightened. The pressurization / travel valve port valve is open and external gas pressure is applied. Liquid is forced along the delivery pipe and may now be transferred.

The Approximate Position of the ice.
The Approximate Position of the ice.

The Repair Procedure

Warning: Open the delivery valve before attempting to open the neck seal. This will prevent any sudden release of cold gas or liquid. Always work with a companion when maintaining cryogens: Situations develop which require extra hands or someone to call for help.

Keep the work space WELL VENTILATED while working on the dewar to avoid any risk of suffocation.

On the instructions of the vendor the neck-clamp was removed and an attempt was made to withdraw the guide pipe. It was completely stuck. Room-temperature helium gas was applied to the pressurization port at increasing pressure until the upper safety valve opened. Pressure was then rapidly reduced via the delivery port. In this way it was hoped to cause turbulence and allow some warmer helium to reach the blockage. After some minutes of this treatment there were signs of some pressurization of the helium tank but the guide pipe assembly remained stuck.

The system was allowed to rest for 2 hours and then a further attempt to move the guide pipe assembly was made. This time it slowly moved. After some minutes of struggle the assembly was removed. A cylindrical collar of Ice surrounded about 3 cm of the guide pipe, some 10 cm from its free end. Apparently the ice had sealed the access to the helium tank via path 2 as shown in Figure 2. The Ice fizzed and sublimed rapidly once in the open air. The guide-pipe/delivery port assembly was then replaced without difficulty. Thereafter the Dewar functioned normally.